35 Earl St, Airport West is a 2 bedroom, 1 bathroom Townhouse with 1 parking spaces and was built in 2023. The property has a land size of 697m2 and floor size of 64m2. While the property is not currently for sale or for rent, it was last sold in May 2019.
Construction due to commence June 2021 and completed by May 2022. Welcome to brand new modern and contemporary living with an unbeatable choice between five different floorplans. Comprising of two bedrooms (plus study in number one) with built in robes, sophisticated light filled kitchens that offer space and functionality combining black appliances, sleek bathrooms including considerable showers, single remote garage with internal access, and balconys to enjoy. Equipped with both sheer and blockout blinds, split systems to comfort all year round, dishwashers and intercoms, these townhouses have it all. Within such close proximity to freeways, schools, Keilor Road, La Manna shopping and 59 tram, an opportunity such as this does not come often.
The size of Airport West is approximately 3.9 square kilometres. It has 15 parks covering nearly 7.1% of total area. The population of Airport West in 2011 was 6,958 people. By 2016 the population was 7,544 showing a population growth of 8.4% in the area during that time. The predominant age group in Airport West is 30-39 years. Households in Airport West are primarily couples with children and are likely to be repaying $1800 - $2399 per month on mortgage repayments. In general, people in Airport West work in a professional occupation. In 2011, 73.9% of the homes in Airport West were owner-occupied compared with 70.7% in 2016.
Airport West has 5,230 properties. Over the last 5 years, Houses in Airport West have seen a 21.75% increase in median value, while Units have seen a 4.90% increase. As at 31 August 2024:
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
© Copyright 2024 RP Data Pty Ltd trading as CoreLogic Asia Pacific (CoreLogic). All rights reserved.